- devices10–14 devices
- RCD1 × 30 mA Type A RCD
- surge protection—
- EV charger · inverter—
An electrician for your home and small business.
Consumer units, dedicated circuits for air conditioning, water heaters and EV chargers, new wiring, inspections before you buy. For flats, houses, shops and offices in north-east Bulgaria. Proper paperwork after every job, not just an invoice.
- 1Main switchcuts everything in one go — in an emergency, during repairs, when replacing an appliance
- 230 mA RCDtrips within milliseconds if current flows through a person; required for bathrooms and kitchens, and we always fit one
- 3A breaker for every circuitlighting, sockets, kitchen, bathroom, air conditioning, water heater, cooker — only the faulty circuit trips, not the whole home
- 4Surge protectionabsorbs surges from the grid or lightning before they reach your TV and inverter
- 5Spare capacity for an EV charger and inverterspace and protection in place, so the board doesn't need replacing again in a year
- 6Circuit chart on the door and QR stickerwhich breaker feeds what; scan the QR code for the installation passport
Pick from the list — you see the price, the total adds up, you send a photo.
Everything we do, with a ‘from’ price for a standard job in Varna. Tap a row to see what's included and which photo we need; press ‘+’ to add it to your list. The final figure comes in the written quote within 24 hours, with no visit needed for routine jobs.
Most popular
A new consumer unit with a main switch, 30 mA RCD and a breaker for every circuit; labelled circuits, circuit chart on the door, QR sticker, test report. If you're planning air conditioning, an EV charger or solar panels, we'll tell you which package you need (see section 02, The consumer unit).
A separate cable from the consumer unit to the appliance, with its own breaker and outlet — so nothing trips or overheats. Run in flexible conduit along the wall or in trunking; in concrete it's charged separately per metre and shown in the quote.
Hanging and connecting the light fitting you've chosen: chandelier, ceiling light, spotlight, LED panel. If the box in the ceiling is old, we'll tell you before we touch anything.
Replacing the mechanism of a socket or switch in the same place: the new device, wiring it in, checking the earth. A range of your choice — Schneider, Legrand, bticino.
Inspection of an installation we didn't fit: we test insulation, earthing, the RCD and loop impedance; photograph the consumer unit and draw up a circuit schedule; tell you what's dangerous and what's recommended. Before you buy, before a renovation, before an EV charger or solar panels.
Priced per point — the room-by-room estimate is in section 03: the lower figure is a new build with cables in the screed, the higher one a renovation with chasing. From laying out the points to the consumer unit and test report: chases, boxes, cables, photos of every wall before plastering, then devices and lighting, testing, and a level C installation passport with the measured position of every point and box.
after a site visit · guide price €4,739–€7,741
Consumer units
A consumer unit for a home with more appliances: two RCDs (one for the bathroom and kitchen, one for everything else), surge protection, 16–24 devices, everything labelled.
A consumer unit with 24+ devices, two RCDs plus space for a Type B, surge protection, space and protection for an inverter and EV charger — so it doesn't need replacing again in a year. The charger and solar panels have their own pages.
after a site visit · guide price €883
When the consumer unit is fine but one device has burnt out or a terminal has worked loose: we replace it, tighten up and check the rest.
The old recess was made for 6–8 fuses; the new consumer unit is 24 modules. If you don't want a surface-mounted unit, we enlarge the recess in the brick wall and make good around the frame.
The same in a concrete wall (panel-built block): we cut with a diamond blade and dust extractor, then break out; we cover the hallway.
after a site visit
The cable from the meter to the consumer unit is often aluminium, too thin for today's appliances, or burnt at the ends. We replace it with copper sized to your contracted supply, in flexible conduit or trunking.
after a site visit · guide price €100
Points and circuits
A new point during a renovation: a chase in brick or aircrete up to 3 m, flexible conduit and cable, back box, fitting the device, connecting in the junction box and testing. In a new build the cable runs in the screed with no chasing — then the point is €40–€50.
We move the socket or switch to its new position: new cable from the junction box, chase, back box; the old spot is blanked off.
A circuit for an EV charger: cable sized to the load, Type B RCD, and a check of the supply capacity in your contract. The charger itself and its installation are on the EV charger page.
Only when the wall is concrete: the chase is cut with a wall chaser and broken out, with dust sheets and a vacuum. In brick and aircrete it's included in the point and circuit prices.
Sockets and switches
We replace every socket and switch in your home with a new range of your choice (Schneider, Legrand, bticino): removal, fitting and an earth check at every point.
Lighting
Fitting and connecting downlights in pre-cut holes in plasterboard or a suspended ceiling. If they're 12 V, the transformer is a separate line item.
LED strip in a recess, under kitchen cabinets or along a cornice: the strip, power supply, a profile if you want one, and a switch or sensor.
A motion or presence sensor instead of a switch: hallway, bathroom, stairs, garage. We set the timer and sensitivity.
Garden lighting: bollards, spotlights, wall lights, cable buried in flexible conduit, a separate RCD for the garden.
after a site visit · guide price €141
Appliances
Water heater not heating, tripping or leaking from the bottom: we replace the element, thermostat or sacrificial anode, and check the breaker and cable.
Connecting a new cooker, oven or hob to its circuit via a connection unit or a socket rated for the load. If the circuit is undersized, we'll tell you.
Bathroom extractor fan or cooker hood: fitting, and wiring to the light switch or separately, with a timer if you want one.
Faults and inspections
We find the cause by testing: a burnt connection in a junction box, damaged insulation, an overloaded circuit. We don't do ‘temporary fixes’ without protection. If there's smoke or flames, call 112 first.
Inspection of a house's electrical installation: consumer unit, earthing, outdoor circuits, garage and garden; testing and a written report; what's dangerous and what's recommended.
Earthing and protection
Earthing for a house that has none or only an old system: earth rods, connection to the consumer unit, resistance test, report.
after a site visit · guide price €143–€307
In the bathroom, the metal parts (pipes, bath, radiator, shower) are connected to earth with a conductor, so there's no voltage difference and no current through you. Required in new bathrooms.
Surge protection in your existing consumer unit: it absorbs surges from the grid or lightning before they reach your TV, computer and inverter.
Low voltage and stairwells
A doorbell or intercom that's stopped working: we check the power supply, button and handset; we replace whatever has burnt out, or swap in a new unit.
An internet or TV socket with a cable to the router or aerial, in flexible conduit or trunking.
Communal stairwell lighting: a timer switch with push buttons on each floor, or sensors; replacing burnt-out fittings with LED. For building managers — on contract.
after a site visit · guide price €83
Prices are incl. VAT and are ‘from’ prices. We confirm market benchmarks before publishing. Outside Varna, a travel fee applies by zone. Chasing into concrete and runs over 3 m are priced in the quote.All prices on the site
Three consumer units — depending on what you'll run off yours.
An old consumer unit from the 90s wasn't built for air conditioning, a water heater, a dishwasher and an EV charger all at once. We replace it in half a day — with an RCD, room for the future and a circuit chart that stays on the door. Which package you need depends on a photo of your board and what you're planning.
- devices16–24 devices
- RCD2 × RCD (wet and dry rooms)
- surge protectionsurge protection
- EV charger · inverter—
- devices24+ devices
- RCD2 × RCD + space for Type B (EV charger)
- surge protectionsurge protection
- EV charger · inverterspace and protection for an inverter and EV charger
Three things we can see in the photo that change the price
The old recess was built for 6–8 fuses; the new consumer unit is 24 modules. By default we fit a surface-mounted unit next to or over the recess — no chasing, no dust, and the old recess is closed off with a cover. Flush-mounted, with the recess enlarged: in brick €42, in concrete after a site visit.
If it's aluminium, undersized or burnt at the ends, a new consumer unit won't fix that. We replace it with copper sized to your contracted supply — after a site visit · guide price €100, based on a photo of the meter. Work on the meter itself is done by the grid operator.
If the wiring stays two-wire: a 30 mA RCD protects people even without an earth; we test the insulation first — a circuit that ‘leaks’ goes on its own RCD; an earth conductor to metal and water — we split the PEN in the board and run new three-core circuits to the water heater, washing machine and bathroom.
‘Consumer unit + RCD + wet-room circuits’ package: the standard board + 2 dedicated circuits; a third circuit goes into the quote.
- trips when two appliances run at once
- there's no RCD
- ceramic fuses or unmarked breakers
- the board is warm to the touch or smells of plastic
- you're adding air con, an EV charger or solar panels
PV/EV ready is the consumer unit for an EV charger and solar panels — we install those too, with one board and one warranty.
During the swap the power is off for about 2 hours — we tell you when in advance, so you can plan around the fridge and computer.
A new installation is priced per point. Here's how many you'll need.
A point is anywhere the wiring comes out of the wall: a socket, a switch, a light outlet. High-power appliances get dedicated circuits from the consumer unit. Pick your rooms and you'll see the range for the standard case described below the card. To be honest: these are typical counts, the site visit pins them down, and the final price is in the quote.
For comparison: a one-bedroom flat usually has 36–50 points and 4–6 appliances on their own circuit; a two-bedroom flat 43–61 points. The range is wide because concrete, cable run lengths and the number of boxes only become clear at the site visit. Devices (switches, sockets, lights) are extra — you choose them from the catalogue.
Why the boxes matter. Junction boxes are where the cables meet. Years later, that’s the first place anyone looks for a fault — and they’re under the plaster. In the passport, every box has its position (wall, distance from the corner, height), a photo of it open and a note of what’s connected inside.
Besides the work — a folder that proves it was done properly.
Most tradesmen do the job and leave. Afterwards nobody knows where the cable runs, which box feeds the kitchen or what breaker was fitted. We leave you four documents. They’re included in the price.
From photo to test report.
Five steps. For a consumer unit, a dedicated circuit or points, we don’t come out for a site visit — the price comes from the photo. For new wiring, a site visit is required and is deducted from the quote.
- day 01
Photo
The consumer unit with the cover off, and the meter; for points — the wall; for a circuit — the board and where the appliance goes. From here or via Viber.
you · 3 minutes - within 24 hours2
Written quote
Itemised price, what’s included and what isn’t, and the timescale — sent within 24 hours. For new wiring — after a site visit (€15, deducted from the quote).
us · within 24 hours - in the diary3
Date
Available dates for your area; confirmation by SMS and email. We tell you when the power will be off and for how long.
together - on the day4
The work
Consumer unit — half a day. Dedicated circuit — 2–4 hours. Points — 2–6 in half a day. New wiring — one-bedroom flat 5–8 working days, two-bedroom 7–10, a house depending on the design; photos before the walls are closed up. If opening up reveals something that wasn’t visible in the photo, we stop and give you the figure before carrying on. When chasing, we use a dust extractor and take the rubble away.
us - at the end5
Testing, report, passport
We test, show you the figures, put the sticker on and sign off the handover. You pay for the labour after sign-off. The passport — on paper and in your profile.
together · 20 minutes
€30 per hour for labour; site visit €15, deducted if you go ahead with the work. Materials are extra. For standard jobs we don't charge by the hour but per item — point, circuit, consumer unit — so you know the figure before we arrive.
€372–€613 for a standard consumer unit with an RCD, including installation, test report and circuit diagram. An extended board with two RCDs and surge protection (SPD) — €613–€715. A board with space for an inverter and an EV charger — after a site visit · guide price €883. Quote the same day from a photo of your consumer unit.
It's priced per point — €40–€50 in a new build, €39–€83 in a renovation — plus dedicated circuits for appliances. It depends on the number of points, the walls (brick or concrete) and whether you'll have an EV charger, solar panels or a smart home. The room-by-room estimate gives you a range in a minute; the final price comes after a site visit.
Switch off the appliance you turned on last and send us a photo of your consumer unit. Often the cause is an overloaded circuit or an old circuit breaker; sometimes it's damaged insulation, which shows up on testing. If there's smoke or flames — 112 first, then us.
Yes. It's mandatory in new installations and the cheapest insurance against electric shock in the bathroom and kitchen. It also works on old two-wire wiring with no earth — it measures the difference between the current in live and neutral. If your consumer unit doesn't have one, we fit it — 30 mA, type A; for an EV charger — type B. Before that we test the insulation: if the wiring is ‘leaking’, the RCDs go on separate circuits.
In a renovation: chasing a channel in brick or aerated concrete up to 3 m, flexible conduit and cable, back box, fitting the device, connecting it in the box and testing — €39–€83. In a new build the cable runs in the screed with no chasing — €40–€50. It doesn't include the device itself (you choose it from the catalogue), concrete (chasing €18 per metre), runs over 3 m, screed or plastering. High-power appliances — hob, oven, water heater, air conditioner — get a dedicated circuit at €93–€205.
A test report (insulation, earthing, RCD, loop impedance), a single-line diagram on the consumer unit door, a QR sticker and the installation passport. Contract and invoice — always. It's all included in the price.
Yes, if they come with a declaration of conformity. Our warranty covers the installation; the manufacturer is responsible for the materials.
Yes — Dobrich, Balchik, Kavarna, Shumen, Byala, Obzor and the villages in between. The travel fee depends on the zone and is in the quote — no surprises.
To the customer they're the same: the person who does your electrical installation. The difference is in the paperwork: the test report under Ordinance RD-02-20-1 — look for that, not the job title.
The payment method and deadlines are in the contract we sign before work starts. Always an invoice, no exceptions.
Not unless you've said yes. If opening up reveals something that wasn't visible in the photo — aluminium cable, a burnt-out box, concrete instead of brick — we stop, take photos and give you the figure before we carry on. No conditional charges and no surprises on the invoice.
We work during business hours by appointment. If your power's gone off, message us with a photo of the consumer unit — we'll tell you what we see and when we can come. We don't promise ‘within the hour’, because we won't lie to you; if there's smoke or flames — 112.
Yavor · Fazo, VarnaA photo of your board today.
A written quote within 24 hours.
The consumer unit with the cover off, the meter, where the appliance goes, or the room. For standard jobs we don’t come out for a site visit — we give you the price from the photo.