The easiest case.The new line starts at the output of your meter and runs along the basement ceiling to your parking space. It doesn’t go through the stairwell, and nothing before the meter is touched.
- Checking the boardWe check where your meter is, what the breaker after it is rated at and whether there’s room for a second breaker.
- Unsealing the boardThis is an official service requested from the operator. They remove the seal, not us.
- New line after the meterIf there’s no room, an extra section is added next to the existing one. From there the cable heads to the basement.
- Owners’ meeting decisionThe route goes through the common areas. We bring a ready-made document that states exactly what consent is being asked for.
- Board and charger at the parking spaceDedicated circuit, RCD protection, tests and a test report. The charger is set to the spare capacity.